DOMINO CONSTRUCTION UPDATE: Weeks of December 2nd and December 9th, 2019

At Site A the ground floor through 42nd floor slabs are complete. The bulkheads for the building are complete. MEP trades will continue fit out work. Precast Facade erection is complete, except for the commercial hoist area of the commercial tower, which will remain open into the next calendar year. Interior fit outs are finished in the residential leg of the building and continue in the commercial leg and the bridge. The South First roadway and sidewalk are accessible to the public. The Grand Street sidewalk has been poured but will remain behind a construction gate until the commercial lobby is opened within the month. The commercial lobby is expected to within the next couple of weeks. There are TCOs are in place and move in’s of the lower residential floors are occurring between 8 am and 5 pm. The commercial leasing team has begun their leasing efforts.

The Refinery shoring work is complete. This consists of steel structures on the exterior to brace the existing brick façade during demolition. Interior demolition has begun, and is still on the 5th floor of the building, working their way downward.

Construction of the Domino Park is complete. The park has opened and has entrances on Grand Street, South 3rd Street and South 5th Street.

The public park located on Site C is open 6 days a week

This entry was posted in Construction Updates. Bookmark the permalink.